Mecru

Ingenuity makes success

:0086-139 3711 5575
Home > Case > Stationary Crushing Line >

250 TPH ballast stone crushing line in Inner Mongolia

250 TPH  ballast stone crushing line  in Inner Mongolia
Project Description

Applicable material:granite

Outlet size:36-46-56-68mm

Scope of application:Railway

Processing capacity:250T/H

Project Benefits

The rapid development of China's railways has driven the demand for ballast stones to rise. This production line is located in Inner Mongolia. It uses granite crushing to produce ballast stone. The main equipments are: C series jaw crusher, single cylinder hydraulic cone crusher, with an output of 250 tons per hour. During production, the granite raw material is firstly crushed by the C series jaw crusher, and then the secondary crushing is formed by the single-cylinder hydraulic cone crusher, and then the vibrating screen is used to screen and discharge the material to form a complete crushing and screening system The ballast stone produced meets the high national standards for railway stones and meets the demand for railway ballast stone.


The advantage of project


1.Advanced technology and reliable equipment

The main equipment of the production line adopts fully automatic control of the production process, which can observe the working status of the equipment in real time. High-quality components and mature processing technology ensure stable and reliable equipment performance and ensure the efficient and stable operation of the entire project.


2.High quality of finished products

The production efficiency is high, the output is large, and the product quality is high, which fully meets the needs of national railway construction.


3.Low cost and convenient operation and maintenance

The production line has high production efficiency, strong bearing capacity, and low maintenance and operation costs. The main equipment includes a full dilute oil lubrication station and a hydraulic jacking device, which facilitates equipment maintenance and reduces labor costs.


4.The scheme design is suitable for local conditions and the layout is reasonable

The project was completed from the design of the project. Mecru has communicated with customers and conducted on-site surveys for many times, comprehensively considering the customer's site. Using the height difference of the site, rationally design the production line, and fully optimize the design plan, not only save the use of equipment, but also greatly reduce the operating cost.

Related products

Customer Reviews

We are fortunate to be able to cooperate with Mecru. As a mining equipment enterprise, Mecru has been cultivating in the stone crushing industry for many years and has rich experience. At present, as far as usage is concerned, I live up to expectations and hope that there will be more opportunities for cooperation in the future.

※ Please Contact Us for your specific application – We provide solutions for each application.

Inquire Online

We promise that all your information will be kept confidential. Please be assured to complete these information. It is just for our sales manager to contact you accordingly.

Products

Other cases