Project Description

Applicable material:construction waste

Outlet size:0-5,5-10,10-25mm

Scope of application:road engineering

Processing capacity:300T/H

Project Benefits

An environmental protection building material company in Tai'an, due to the large number of aggregate projects and relatively scattered, the company finally chose Mecru mobile crushing production lineafter various investigations and comparisons in order to reduce costs and achieve a higher return on investment. It took a total of 2 months from the landing to production to put the project into operation quickly. The waiting period is short and the return investment is fast. The customer is very satisfied.


The advantage of project


1.Integrated whole set and small area covered

The installation form of the integrated unit equipment eliminates the complicated site infrastructure installation operations and reduces the consumption of materials, working hours and site occupation.


2.On-site crushing to reduce material transportation costs

The mobile crushing station can directly do the front-line crushing of the material. It eliminates the intermediate link of the material from transportation crushing, which reduces the transportation cost of the material.


3.Flexible

The mobile crushing station truck is convenient for driving on ordinary roads, and is more convenient for driving in the rugged and harsh road environment of the crushing area. It saves time for entering the construction site faster, and provides more flexible space and reasonable layout configuration for the overall crushing process.


4.Strong adaptability and flexible configuration

For the crushing and fine crushing screening systems, the mobile crushing station can be operated independently by a single unit, or it can be flexibly composed of the system to configure the unit for joint operation. The side exit of the discharge hopper provides a variety of configuration flexibility for the screening material transport method.


5.Reliable performance and easy to maintenance

The overall equipment has stable performance, low operating cost and even discharge. And the structure is simple and easy to repair and maintain.

Related products

Customer Reviews

Mecru is very experienced in construction waste crushing. During the inspection stage, the project manager of Mecru took us to visit many of the construction waste crushing projects designed and built by their company. Rich project cases and good customer feedback were the main reasons why we chose Mecru. Now the equipment is put into use, I am very satisfied with that because the operation is stable, the output is large and the benefit is high!

※ Please Contact Us for your specific application – We provide solutions for each application.

Inquire Online